← Back to all scripts
ARKSorceress Pro

ARKSorceress Pro

Hidden-gem Thieving from 1 to 99 — empty worlds, free herbs, and Sq'irk juice.

Thieving $3.99

Overview

ARKSorceress Pro runs Sorceress's Garden for up to 90k Thieving XP/hour at the Summer Garden — plus cleaned herbs, Farming XP, and Sq'irk juice along the way.

The hidden-gem Thieving method most players don't even know about: low requirements, empty worlds, no combat risk, and one of the best Ironman herb sources in the game.

Built for TRiBot Echo and maintained as part of the ARKScripts suite.

Features

Why Sorceress Garden?

  • Up to 90k Thieving XP/hour at the Summer Garden (65 Thieving) on standard methods; see the OSRS Wiki Sorceress's Garden page for the latest rates.
  • Best Ironman herb source in the game — herbs are collected pre-cleaned, no Cleaning skill check.
  • Fast early Thieving for Master Farmers, Rogue's Den, Tithe Farm prep, and 1-99 routes.
  • Low-click, low-crowd, no-combat — the AFK-friendly Thieving method that doesn't get the attention it deserves.

Shop Page Feature Set

  • Solves Winter, Spring, Autumn, and Summer Gardens.
  • Collects XP through Sq'irks or herbs for money/Herblore.
  • Mass-world aware Sq'irk support for World 523/524 style training when the activity is populated enough to be viable.
  • Completes Prince Ali Rescue automatically when required.
  • Progressive modes for 1-99 Thieving or 1-65 then Summer Garden herb farming.
  • Ironman mode with rune/walking assumptions instead of trade-only teleport assumptions.
  • Acquires beer glasses automatically for easier setup.

Supplies and Automation

  • Stamina, Super Energy, Energy Potions, and Strange Fruit support.
  • Grand Exchange restocking and automatic herb/loot selling.
  • Option to exchange Sq'irks automatically or bank them for manual big XP drops.
  • Low-ping world hopping and hop-if-1-click-maze setup behaviour.
  • Argument support, auto-bonding, Discord webhooks, and ARKMule integration.

All ARKScripts

Every modern Pro ARKScript is built on the same production-minded philosophy: strong core automation, practical account upkeep, clean recovery, and support systems that make the script useful beyond a short test run.

  • Built for TRiBot Echo with modern OSRS support and active maintenance.
  • Created by Ark, a script developer with 15+ years of automation experience.
  • Profile saving and repeatable setup for fast, consistent account configuration.
  • Script argument support for launching saved setups from TRiBot script arguments without rebuilding the GUI every run.
  • Grand Exchange restocking, automatic supply buying, and budget-aware account upkeep where relevant.
  • Automatic loot selling, profit handling, and clean long-session banking flows where relevant.
  • ARKMule integration with local and non-local mule support, gold thresholds, and gold requests.
  • Auto-bonding and membership renewal for accounts designed to keep running.
  • Discord webhooks for stops, rare drops, mule transfers, account issues, and important events.
  • Flexible stop conditions for runtime, target levels, item goals, pets, reward thresholds, and script-specific milestones.
  • Recovery systems for deaths, stuck states, missing supplies, bad travel states, repeated messages, and failed interactions.
  • World hopping controls, region selection, crowd handling, and low-CPU / imageless paint options where supported.
  • Ironman-aware behaviour where the activity supports it, avoiding trade-only assumptions and supporting resource-focused play.

◆ Hyper-Human Mode

Hyper-Human is ARKScripts' AI-powered anti-profiling and humanisation system. It is built to make accounts feel less like cloned bots and more like different people playing the same activity.

  • Account-specific behavioural personality using persistent account seeds and per-account action weighting.
  • Contextual human actions during downtime, including XP checks, gear checks, inventory checks, camera movement, minimap use, world map use, bank browsing, and interface interaction.
  • Circadian breaking, microbreaking, fatigue modelling, Hyper-AFK style behaviour, and noob-mode options where appropriate.
  • Multi-method anti-profiling across routes, timings, interactions, locations, breaks, task selection, and session behaviour.
  • Designed to avoid cloned account behaviour, so two accounts running the same ARKScript can still look meaningfully different over time.

Support

All ARKScripts support is handled on Discord, including setup help, bug reports, feature requests, announcements, update notes, and a powerful ticket system.

◆ Join the ARKScripts Discord

Final Word

ARKSorceress Pro gives Sorceress Garden the ARKScripts treatment: maze solving, herbs, Sq'irks, Ironman support, progression, restocking, muling, and AI-powered humanisation.

ARKSorceress Pro is part of the ARKScripts ecosystem: best-in-class scripts, AI-powered Hyper-Human behaviour, serious automation systems, and support from a developer with 15+ years of script development experience.

#dontsettle #useark

Related ARKScripts

Get Started