← Back to all scripts
ARKWoodcutter Pro AIO

ARKWoodcutter Pro AIO

Forestry, Sulliusceps, Redwoods — every modern Woodcutting method, 1 to 99.

Woodcutting $3.99

Overview

ARKWoodcutter Pro is the most complete Woodcutting script in OSRS — Forestry, Sulliusceps, Redwoods, Hardwood Grove, every tree the game has, with bonfires, fletching, and rewards stacked on top.

Not a chop-and-drop loop. ARKWoodcutter handles every modern Woodcutting method, every Forestry event, every reward, every axe upgrade — 1 to 99, mains and Ironmen alike.

Built for TRiBot Echo and maintained as part of the ARKScripts suite.

Features

Shop Page Feature Set

  • 1-99 progressive training with automatic task switching based on chosen levels.
  • Bank logs, drop logs, bonfire logs, or fletch logs then bank/drop outputs.
  • Full Forestry integration for bonus XP across Woodcutting, Firemaking, Fletching, Farming, Hunter, and Thieving.
  • Forestry event support including Struggling Sapling, Anima Roots, Ent Pruning, Beehive Builder, Pheasant Control, Fox Poachers, Leprechaun, Ritual, and Flowering Bushes.
  • Forestry Pack purchasing and quick-banking via Leprechauns.
  • Bird nest looting and optional opening, even when dropping logs.
  • Axe upgrades and special attacks, including Dragon/Crystal axes and Infernal/Crystal functionality.
  • Grand Exchange restocking, loot selling, reward-shop automation, muling, combat avoidance, and deathwalking.

Supported Trees

  • Normal, Achey, Oak, Willow, Teak, Mahogany, Maple, Arctic Pine, Yew, Blisterwood, Sulliusceps, Magic, Redwood, and location-specific banking routes such as Hardwood Grove where supported.

Why It Stands Out

  • Full Forestry support turns Woodcutting into a multi-reward activity instead of a narrow XP loop.
  • Sulliusceps support gives access to one of the fastest Woodcutting XP methods in the game.
  • Reward-shop automation can generate meaningful GP through Forestry purchases.
  • F2P and Ironman support make it useful for many account types.

All ARKScripts

Every modern Pro ARKScript is built on the same production-minded philosophy: strong core automation, practical account upkeep, clean recovery, and support systems that make the script useful beyond a short test run.

  • Built for TRiBot Echo with modern OSRS support and active maintenance.
  • Created by Ark, a script developer with 15+ years of automation experience.
  • Profile saving and repeatable setup for fast, consistent account configuration.
  • Script argument support for launching saved setups from TRiBot script arguments without rebuilding the GUI every run.
  • Grand Exchange restocking, automatic supply buying, and budget-aware account upkeep where relevant.
  • Automatic loot selling, profit handling, and clean long-session banking flows where relevant.
  • ARKMule integration with local and non-local mule support, gold thresholds, and gold requests.
  • Auto-bonding and membership renewal for accounts designed to keep running.
  • Discord webhooks for stops, rare drops, mule transfers, account issues, and important events.
  • Flexible stop conditions for runtime, target levels, item goals, pets, reward thresholds, and script-specific milestones.
  • Recovery systems for deaths, stuck states, missing supplies, bad travel states, repeated messages, and failed interactions.
  • World hopping controls, region selection, crowd handling, and low-CPU / imageless paint options where supported.
  • Ironman-aware behaviour where the activity supports it, avoiding trade-only assumptions and supporting resource-focused play.

◆ Hyper-Human Mode

Hyper-Human is ARKScripts' AI-powered anti-profiling and humanisation system. It is built to make accounts feel less like cloned bots and more like different people playing the same activity.

  • Account-specific behavioural personality using persistent account seeds and per-account action weighting.
  • Contextual human actions during downtime, including XP checks, gear checks, inventory checks, camera movement, minimap use, world map use, bank browsing, and interface interaction.
  • Circadian breaking, microbreaking, fatigue modelling, Hyper-AFK style behaviour, and noob-mode options where appropriate.
  • Multi-method anti-profiling across routes, timings, interactions, locations, breaks, task selection, and session behaviour.
  • Designed to avoid cloned account behaviour, so two accounts running the same ARKScript can still look meaningfully different over time.

In Action and Progress

ARKWoodcutter includes modern Woodcutting support such as Forestry and Sulliusceps, not just chop/drop loops.

ARKWoodcutter Sulliusceps

ARKWoodcutter progress

Support

All ARKScripts support is handled on Discord, including setup help, bug reports, feature requests, announcements, update notes, and a powerful ticket system.

◆ Join the ARKScripts Discord

Final Word

ARKWoodcutter Pro is one of the most complete Woodcutting scripts available: Forestry, Sulliusceps, felling axes, bonfires, fletching, rewards, restocking, muling, and Hyper-Human behaviour.

ARKWoodcutter Pro is part of the ARKScripts ecosystem: best-in-class scripts, AI-powered Hyper-Human behaviour, serious automation systems, and support from a developer with 15+ years of script development experience.

#dontsettle #useark

Related ARKScripts

Get Started